Gare de Cergy Pontoise

Gare de Cergy Pontoise

Railing infill made from architectural mesh DOKA-MONO 1591 bolted into frames.


The wire mesh elements were bolted into frames and uses as a railing infill for this project in France.

The idea of the architect was to maintain the vertical wires, so that the mesh follows the inclination of the stairs, which was consideren in the design of the frames.

Gare de Cergy Pontoise

City

Cergy, France

Application

balustrade, falling protection

Object Type

gardens / parks

Mesh Type

Top